Theory of Constraints (TOC):

Learning objectives of the article:

  1. Define and explain the concept of theory of constraints (TOC)

  2. Give an example of the implementation of theory of constraints.

Definition:

Theory of constraints (TOC) is a management approach that emphasizes the importance of managing constraints. A constraint or bottleneck is any thing that prevents you from getting more of what you want. Study of constraints or bottlenecks, keeping their record and taking necessary steps to improve them is also known as bottleneck accounting.

Explanation of the Concept:

Every individual organization faces at least one constraint. So it is not difficult to find examples of constraints. For example, You may not have time to study  thoroughly for every subject and to go out with your friends on the weekend, so time is your constraint.

Since a constraint prevents you from getting more of what you want, the theory of constraints (TOC) maintains that effectively managing the constraint is the key to success. As an example, long waiting surgery is a chronic problem in the National Health Service. For example up to 100 referrals from general practitioners can be processed in a day.

100 patients per day

100 patients per day

50 patients per day

150 patients per day 15 patients per day 60 patients per day 140 patients per day

General practitioner→ referral

Appoint made→ Outpatient visit→

Add to surgery→ waiting list

Surgery→

Follow-up visit→

Discharge

Processing surgery patients at an NHS facility

This diagram originally appeared in the February 1999 issue of the U.K. Magazine Health Management

The constraint, or bottleneck, in the system is determined by the step that has the smallest capacity--in this case surgery. The total number of patients processed through the entire system cannot exceed 15 per day-the maximum number of patients that can be treated in surgery.

No matter how hard managers, doctors, and nurses try to improve the processing rate elsewhere in the system, they will never succeed in driving down the wait lists until the capacity in the system is increased. In fact, improvement elsewhere in the system-particularly before the constraint-are likely to result in even longer waiting times and more frustrated patients and health care providers. Thus improvements efforts must be focused on the constraint to be effective. A business process such as the process for serving sugary patients, is like a chain. If you want to increase the strength of a chain, what is the most effective way to do this? Should you concentrate your efforts on strengthening the strongest link, all the links, or the weakest link? Clearly, focusing your effort on the weakest link will bring the biggest benefit.

Continuing with this analogy, the procedure to follow to strengthen the chain is clear. First, identify the weakest link, which is the constraint. Second, don't place a greater strain on the system than the weakest link can handle-if you do, the chain will break. Third concentrate to improve the weakest link. Fourth, if the improvement efforts are successful, eventually the weakest link will improve to the point where it is no longer the weakest link. At this point, the new weakest link must be identified, and improvement efforts must be shifted over to that link. This simple sequential process provides a powerful strategy for continuous improvement.

Theory of constraints (TOC)  approach is a perfect complement to other improvement tools such as Total Quality Management (TQM) and Business Process Reengineering. It focuses improvement efforts where they are likely to be most effective.

Real Business Example:

The Constraint is the key:
The Lessons plant of Baxter International makes medical products such as sterile bags. Management of the plant is actually aware of the necessity to actively manage its constraints. For example, when materials are a constraint, management may go to a secondary vendor and purchase material at a higher cost than normal. When a machine is the constraint, a weekend shift is often added on the machine. If a particular machine is chronically the constraint and management has exhausted the possibilities of using it more effectively, then additional capacity is purchased. For example when the constraint was the plastic extruding machines, a new extruding machine was ordered. However even before the machine arrived, management had determined that the constraint would shift to the blenders once the new extruding capacity was added. Therefore a new blender was already planned. By thinking ahead and focusing on the constraints, management is able to increase the plant's real capacity at the lowest possible cost.

Source: Eric Noreen, Debra Smith, and Jams Mackey, The Theory of Constraints and its Implications for Management Accounting (Montvale, NJ: The IMA Foundation for Applied Research, Inc., 1995)

You may also be interested in other relevant articles:

Just-in-Time (JIT) Manufacturing and Inventory Control System:

Just In Time (JIT) is a production and inventory control system in which materials are purchased and units are produced only as needed to meet actual customer demand. Under ideal conditions a company operating at just in time manufacturing system would purchase only enough materials each day to meet that days needs. Moreover, the company would have no goods still in process at the end of the day, and all goods completed during the day would have been shipped immediately to customers. Click here to read full article.

Kanban:

A Kanban system is a means to achieve just in time (JIT) production. It works on the basis that each process on a production line pulls just the number and type of components the process requires, at just the right time. The mechanism used is a Kanban card. This is usually a physical card but other devices can be used Two types of such cards are usually used. Click here to read full article.

Total Quality Management (TQM) System:

Total quality management (TQM) is an improvement program which provides tools and techniques for continuous improvement based on facts and analysis; and if properly implemented, it avoids counterproductive organizational infighting. Click here to read full article.

Six Sigma:

Six sigma is a quality standard that establishes a goal of no more than 3.4 defects per million units or procedures. What does the name mean? Click here to read full article.

Business Process Reengineering (BPR):

A business process is any series of steps that are followed to carry out some task in a business. Process reengineering focuses on simplification and elimination of wasted efforts. A central idea of process reengineering is that all activities that do not add value to a product or service should be eliminated. Click here to read full article.
 

Our Request

Dear visitor! Do you like this article? If you like, then please bookmark this page and also share with your friends. Thank you for your support.

 [Report Errors and Omissions]

 

Home Page | Business Improvement Programs Main Page


Bookmark and Share
 


Our Message

We love our visitors and want to work for them.


Our Request

Knowledge is free for all. Please tell others about this site. Share this site at yahoo, Facebook, Google and other social sits and forums.
In this way you will encourage
accountingformanagement.com to continue writing high quality accounting articles for you.  Thank you for your support.


Managerial Accounting Articles
 
Business and Quality Improvement Programs
Cost Terms, Concepts and Classification
Job Order Costing system
Process Costing System
Process Costing System - Addition of Materials and Beginning Inventory
Controlling and Costing Materials
Materials and Inventory Cost Control
By Products and Joint Products Costing
Cost-Volume-Profit-Relationship
Variable Costing System
Activity Based Costing System
Budgeting and Planning
Standard Costing and Variance Analysis
Gross Profit Analysis
Linear Programming Technique
Segment Reporting and Transfer Pricing
Capital Budgeting Decisions
Service Department Costing
Preparing Cash Flow statement
Financial statement Analysis
Pricing Products and Services
Managerial Accounting Terms and Definitions
Managerial / Cost Accounting Formulas

Financial Accounting Articles
Bookkeeping and Bookkeeping Terms
Accounting Principles and Accounting Equation
Journal
Ledger
Accounting For Bills of Exchange
Subdivision of Journal
Final Accounts
Capital and Revenue Items
Single Entry System/Accounting From Incomplete Records
Accounting For Non-Trading Concerns
Accounting for Consignment / Consignment Accounts
Accounting for Joint Ventures
Accounting for Depreciation

Articles By International Authors

Accounting Articles

Advertisements

 
 

 
Home | Advertise With Us | Privacy Policy | Disclaimer & Terms of Use | Site map | Links | Link to us About Us | Contact Us

No text of this website can be republished without permission of the owner of this site and the authors of these managerial, management, and cost accounting articles. Otherwise sever civil and criminal penalties shall be imposed. All rights reserved.
Copy right © 2009