Multiple Predetermined Overhead Rates Definition:
A costing system in which there are multiple overhead cost pools with a
different predetermined rate for each cost pool, rather than a single
predetermined overhead rate for the entire company. Frequently, each
production department is treated as a separate overhead cost pool.
. |