Site Search                  

Loading

Home page     Downloads      Privacy policy     Disclaimer & terms of use     Contact us     Advertise with us     About us      Link to us

Home » Managerial/Management/Cost Accounting Terms and Definitions » Multiple Predetermined Overhead Rates Definition

New Page 1

Multiple Predetermined Overhead Rates Definition:

A costing system in which there are multiple overhead cost pools with a different predetermined rate for each cost pool, rather than a single predetermined overhead rate for the entire company. Frequently, each production department is treated as a separate overhead cost pool.

.

New Page 1

Back to Home Page | Back to Managerial Accounting Terms Main Page

New Page 1
Share
A D V E R T I S E M E N T S
 
 

Home page   Download Material   Privacy policy   Disclaimer & terms of use   Contact us   Advertise with us   About us   Useful links   Link to us

Copyrights of all content on this web site are owned by Accounting For Management except where indicated in source or copyright statements. Accounting For Management must be contacted for permission to copy or redistribute any material published on this website.
Copyright 2011 Accounting For Management. All rights reserved.